Create a Pipe Layer
The suggestion below is based on the above diagram. You can create multiple pipe and Symbol layers for your diagram. Here are some of the options to consider:
- Both Hot and Cold pipes on one Layer:
- Use two Pipe elements. One for Hot water and one for Cold water.
- Select the Hot water Pipe element and shade it Red.
- Select the Cold water Pipe element and shade it Blue
- Two Piping Layers:
- Hot water pipes shaded in Red on one layer – one Pipe element.
- Cold water pipes shaded in Blue on another layer – one Pipe element.
- Symbols/images, Text (Labels), and/or Data Points:
- Same layer as the two pipes.
- Separate layer for each:
- Symbols/images only.
- Text labels
- Data Points