Create a Pipe Layer

The suggestion below is based on the above diagram. You can create multiple pipe and Symbol layers for your diagram. Here are some of the options to consider:

  • Both Hot and Cold pipes on one Layer:
    • Use two Pipe elements. One for Hot water and one for Cold water.
    • Select the Hot water Pipe element and shade it Red.
    • Select the Cold water Pipe element and shade it Blue
  • Two Piping Layers:
    • Hot water pipes shaded in Red on one layer – one Pipe element.
    • Cold water pipes shaded in Blue on another layer – one Pipe element.
  • Symbols/images, Text (Labels), and/or Data Points:
    • Same layer as the two pipes.
    • Separate layer for each:
    • Symbols/images only.
    • Text labels
    • Data Points