Modifying the Priority of Operating Procedures

When an event occurs in the system, it may match the filter conditions of more than one operating procedure. However, only one procedure at a time can execute in assisted treatment, so that the one with the highest priority will run.

  1. System Manager is in Engineering mode.
  1. In System Browser, select Management View.
  2. Select Project > System Settings > Operating Procedures.
  3. In the Operating Procedures tab, select an operating procedure in the list and do one of the following:
    • Click Priority and enter a new value.
      NOTE: Zero is the highest priority. The system does not allow giving the same priority to two procedures.
    • Click Move Up or Move Down.
      NOTE: The topmost procedure has the highest priority.
  4. Click Save .