(Optional) Remove Events of a Project
After the project is restored the events configured in the restored project are not deleted automatically. Do the following procedure to remove all the events of the restored project at one go.
- The upgraded project is stopped and selected in the SMC tree.
- Click Remove Events to delete all the events from the project.
- A confirmation message displays.
- Click OK.
- All the events of a project are deleted.