Link an HDB to the Project

  1. In the SMC tree, select your project.
  1. Select the Project Settings tab and then the Server Project Information expander.
  1. In the Linked HDB drop-down list, select the restored History Database.
  1. Click Save .
  • The History Database is linked with the project and logs history data.